Sr Project Manager - Commercial Construction
Company: A to Z Staffing Solutions
Location: Phoenix
Posted on: March 20, 2023
|
|
Job Description:
Accountability and complete ownership of assigned job(s). Plan,
directs, and coordinates activities of designatedproject to ensure
that goals or objectives of the project are accomplished within the
prescribed time frame andfunding parameters by performing the
following duties personally or through subordinate supervisors or
staff.ESSENTIAL FUNCTION AND BASIC DUTIESESTIMATING TURNOVER
REVIEW--- Estimate in detail.--- Review job check list with
estimators.--- Look at specs and make detailed list of all
deficiencies in project.REVIEW ESTIMATE--- Review contract for
scope in detail.--- Make list of any deficiencies. A copy of the
contract scope is to be included in turnover.--- Give copy of scope
and exclusions to field.JOB CHECK LIST--- Review job checklist
before proceeding. Job checklist must be accurate and include
allnecessary details.--- Begin processing with assistant and
coordinate with job setup sheet.PURCHASING--- Purchasing of
equipment will be done from job checklist.--- Price details of each
piece of equipment, material, subcontracts, etc.--- Layout purchase
schedule. Do not buy any equipment for a project until the job
buyout iscomplete. This allows flexibility to lower any
deficiencies in a project.SUBMITTALS--- Reviews specifications and
drawings to ensure that the proper materials are submitted
forreview.--- Review submittals prior to delivery to ensure that
all relevant material is indicated.--- Follow through with
re-submittals as required.BUDGET--- Reviews budget/project in
detail to determine budget validity and correctness.--- Revise
budgets as necessary to correct any posting errors, but-out savings
or coding revisions.--- Adjust budget accordingly on all change
orders.BILLING FORMAT--- Accounting posts billings and gives
account status on receivables, not track retention. Theproject
manager is responsible for billing start to finish.--- Prepare all
billings from Solomon Software and check accounts receivable for
the month'speriod on outstanding materials scheduled to ship.---
Equipment delivery schedules and subcontractor billing status to be
forwarded to projectmanager.--- Review all job reports,
subcontractors' status, and equipment delivery list. Visit job
sites priorto billing cut off dates, project labor, and material
costs through the end of the billing period.Follow up on problems
with billings, make corrections if billings are cut back, turn
intoaccounting for monthly updates, and send e-mail to purchasing
and accounting with any fieldproblems. Coordinate percent of
completion with superintendents. Minimize stored materials.--- Bill
and follow up on closeout of retention and bill 50 percent of
retention.--- Communicate with project manager or owner after
billings are approved on a monthly basis.--- Accounting will post
acceptable billings.--- All billings formats will be setup on an
AIA standard format.PROJECT TASK ANALYSIS--- Assistant will prepare
and distribute to project managers, superintendents, and
operationmanagers on a weekly basis. These reports will be used to
project weekly labor.--- Coordinate manpower status with
superintendent to assist in directing / projecting manpowerneeds
and job progress.--- Coordinate with general contractors
schedule.DETAILED PROJECT COST ANALYSIS--- Assistant is responsible
for delivering these reports by the 18 th of each month.--- These
reports detail per code, labor, material, job status, breakdown,
billing, and totals perdepartment.--- Review all codes and any
variances in detail and determine whether codes are over /
underbudget.--- Stop payment to any vendor or subcontractor by
posting messages via Solomon. Assistant mayperform this function if
approved by project manager.SCHEDULING--- Schedule project start
dates and review the general contractor's schedules.--- Inform
assistant of schedule to coordinate with -manpower schedule, per
project to becoordinated with superintendents.SCHEDULING
EQUIPMENT--- Order all equipment as project requires. Delivery
dates to match equipment to be installed asscheduled.--- Check all
equipment, do hand schedules, and verify with field that equipment
is orderedcorrectly before processing equipment orders.--- The
equipment delivery checklist must be completed at time of
submittals. The assistant willtrack all equipment status and
approval delivery dates, coordinate dates to release
equipment,revise list as new delivery dates are added and delivery
cutoff dates met.PURCHASING / PURCHASE ORDERS--- Obtain number from
purchasing department.--- Complete and process purchase orders with
dollar amounts.--- Distribute copies to accounts payable and
purchasing.--- Assistant will track equipment scheduled, verifying
all materials and equipment are coordinatedwith superintendents.---
Any additions or changes to the original purchase order must have a
new purchase order ofchange form.--- No verbal orders to purchasing
or suppliers on any orders processed.SUBCONTRACTORS--- Process
amounts of subcontracts and give to assistant to process. Assistant
will track returnsfor filing.--- Any change to subcontract must be
processed on subcontract change form.REQUEST FOR INFORMATION---
RFI's must be processed for any deficiencies recognized through
review of specifications andsubmittal process.--- All RFI need to
be copied and added to turnover books.--- As project progresses,
all RFIs will be approved by project manager before field can
process.--- All RFIs will go through assistant for numbering and
tracking.CHANGE ORDERS--- Prepare documentation on change order
scope.--- Execution of change order work and billing.--- Tie-out
all paper work to contract.OPERATION AND MAINTENANCE MANUAL---
After materials and equipment are ordered, direct assistant to put
together materials.Assistant will track all material orders and for
finalizing books.--- Project manager to check on close out
warranties.TURNOVERS--- Prepare list of all equipment, materials,
type of materials, list of contracts, copy of contractscope,
equipment delivery schedules, copy of product check list, all RFIs
outstanding andanswered, copy of plans and specifications, addenda,
equipment lists verified for ordering,construction schedule, setup
first two weeks interval schedule, complete details of status
ofproject, set goal, and review manpower requirements. Submittals
setup will take place at thenext coordination
meeting.CORRESPONDENCE--- Review all correspondence in a timely
manner. If an RFI is required, process in a timelymanner.--- All
correspondence to be processed to the filed on a weekly basis. Any
verbal direction tosuperintendents or foremen must be followed by
written correspondence.--- The assistant will process / track all
correspondence.JOB COORDINATION--- A monthly coordination meeting
will be held with superintendents / foremen to discussprojects,
goals, objectives, and job status.--- Service to be included if
installation work is part of a job.TURNOVER - SERVICE--- Copy each
construction schedule and give to service throughout job.--- A
turnover meeting will be held two weeks prior to startup. Plans,
specs, submittals, andare to be issued to service during this
meeting.--- Startup request will be completed by the project
manager assistant prior to meeting and issuedto service at turnover
meeting.--- Service will startup job and ensure that controls are
working properly.--- Service will notify project manager when job
is ready for test and balance, including final filterchange.---
Project manager will schedule test and balance.--- Service
technician to accompany test and balance contractor to jobsite.---
Deficiency list will be issued to operations.--- Service will
complete deficiency list and return to operations.--- Operations
will notify balance contractor of completion of deficiency list---
Once balance is complete, project coordinator turn it over to
service to schedule owner trainingand notify service via e-mail.---
Service will perform owner training, get signed off, and turn in to
operations.PUNCH LIST--- All punch lists will be received by
project manager and logged into the system.--- Distribute punch
list to appropriate departments.--- Completed punch lists will be
returned to operations for recording.PROJECT CLOSEOUT--- Review all
close-out documentation.--- Prior to closeout sheet completion, a
job analysis needs to be completed and coordinated
withestimating.--- Closeout project and file all
documents.QUALIFICATIONSEDUCATION: High School Diploma or
equivalent.Powered by JazzHR
Keywords: A to Z Staffing Solutions, Phoenix , Sr Project Manager - Commercial Construction, Professions , Phoenix, Arizona
Click
here to apply!
|